2 Commits

Author SHA1 Message Date
raphael 77197b9c1e e84: per-port FSM via E84PortStore
E84 (Parallel I/O) is fundamentally per-load-port: each port has its
own ten-wire handshake with the AMHS.  Earlier revisions modeled it
as a single equipment-wide FSM; this commit refactors to a per-port
store, so multi-LP tools can run independent handshakes in parallel.

Public API change in EquipmentDataModel:
  E84StateMachine e84;   -> removed
  E84PortStore    e84_ports;  // create(port_id), get(port_id), ...

Convenience pass-throughs: E84PortStore::on_signal_change auto-creates
the port on first use (ergonomic for demos); applications should call
create() explicitly with their full port set.

The two existing callsites (test_gem300_scenario, test_e87_wire_scenarios)
are updated.  The multi-LP test now demonstrates the actual win:
interleaved LP1 load + LP2 unload handshakes that reach their
respective Ready states without sequencing, and an ES on LP1 that
does NOT affect LP2 — exactly the failure mode the previous design
couldn't catch.

Five new dedicated tests in test_e84_ports.cpp for the store itself.

COMPLIANCE.md §4i updated: row now reflects per-port design.

Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com>
2026-06-09 11:50:18 +02:00
raphael 9fbab92106 Q: GEM300 end-to-end conformance scenario harness
tests / build-and-test (push) Failing after 33s
A single integration test that drives every top-level FSM through
the coordinated lifecycle a real fab acceptance test exercises:

  1.  EPT NonScheduledTime -> Standby -> Productive (E116)
  2.  E84 load handshake at LP1 (CS_0 -> VALID -> L_REQ -> BUSY -> COMPT)
  3.  LoadPort transfer Loading -> InService; Carrier created + associated
  4.  CIDS NotConfirmed -> Confirmed via host ProceedWithCarrier (E87)
  5.  Slot map populated + CSMS NotRead -> Read
  6.  Two substrates created from carrier slots 1 and 2
  7.  Per-substrate IDS NotConfirmed -> WaitingForHost -> Confirmed
  8.  PJ + CJ created (E40 + E94, with PPID validator + PJ-membership)
  9.  CJ Queued -> Selected -> WaitingForStart -> Executing (E94)
  10. PJ Queued -> SettingUp -> WaitingForStart -> Processing (E40)
  11. Each substrate Acquire -> StartProcessing -> EndProcessing -> Release
  12. Module StartGeneral -> StartStep -> CompleteStep (E157)
  13. PJ ProcessComplete; CJ AllJobsComplete -> Completed
  14. Substrate locations AtDestination + processing Processed
  15. E84 unload handshake (CS_0 -> VALID -> U_REQ -> BUSY -> COMPT)
  16. LoadPort Unloading -> InService; disassociate
  17. EPT Productive -> Standby

Total: 278 test cases, 1436 assertions — all green.  Any regression
in a single FSM that breaks cross-FSM coordination surfaces here.

Closes the J-Q tranche set.  Repository now exercises the full
GEM300 stack from physical I/O (E84) through SECS-II messaging (E5),
the equipment model (E30/E120), job management (E40/E94), substrate
tracking (E90), carrier/port management (E87), performance tracking
(E116), and module process tracking (E157).

Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com>
2026-06-08 09:19:04 +02:00