Q: GEM300 end-to-end conformance scenario harness
tests / build-and-test (push) Failing after 33s
A single integration test that drives every top-level FSM through
the coordinated lifecycle a real fab acceptance test exercises:
1. EPT NonScheduledTime -> Standby -> Productive (E116)
2. E84 load handshake at LP1 (CS_0 -> VALID -> L_REQ -> BUSY -> COMPT)
3. LoadPort transfer Loading -> InService; Carrier created + associated
4. CIDS NotConfirmed -> Confirmed via host ProceedWithCarrier (E87)
5. Slot map populated + CSMS NotRead -> Read
6. Two substrates created from carrier slots 1 and 2
7. Per-substrate IDS NotConfirmed -> WaitingForHost -> Confirmed
8. PJ + CJ created (E40 + E94, with PPID validator + PJ-membership)
9. CJ Queued -> Selected -> WaitingForStart -> Executing (E94)
10. PJ Queued -> SettingUp -> WaitingForStart -> Processing (E40)
11. Each substrate Acquire -> StartProcessing -> EndProcessing -> Release
12. Module StartGeneral -> StartStep -> CompleteStep (E157)
13. PJ ProcessComplete; CJ AllJobsComplete -> Completed
14. Substrate locations AtDestination + processing Processed
15. E84 unload handshake (CS_0 -> VALID -> U_REQ -> BUSY -> COMPT)
16. LoadPort Unloading -> InService; disassociate
17. EPT Productive -> Standby
Total: 278 test cases, 1436 assertions — all green. Any regression
in a single FSM that breaks cross-FSM coordination surfaces here.
Closes the J-Q tranche set. Repository now exercises the full
GEM300 stack from physical I/O (E84) through SECS-II messaging (E5),
the equipment model (E30/E120), job management (E40/E94), substrate
tracking (E90), carrier/port management (E87), performance tracking
(E116), and module process tracking (E157).